You’ve got tall posts to install, and that means you need equipment that is just as sturdy and durable. Our Long-John Post & Pile Driver is one of the most popular units that our customers have had in their arsenal for years to safely and efficiently install tall posts and piles of all kinds. Like all our equipment, this unit uses true vibration technology with an output of up to 5,000 vibrations per minute to help get the largest job done.
The Long John is also Vibe Drive's biggest Vibrating Post & Pile Driver, weighing 1,500 lbs and requiring a larger skid steer model to handle it safely.
This vibrating post & pile driver unit has a built-in hydraulic ram that will allow you to slide the vibrating head to your desired height. This means you can install posts and piles up to 18+ feet in length.
You can control everything from the inside of your cab, or if you are working with your team, they can control the Long John ram up and down motion with the external wired remote.
The Long-John is used by clients almost entirely for driving steel. Considering the cost of most Pile Drivers, the Long-John is extremely cost competitive.
Make even the largest job easier and safer by contacting Vibe Drive to receive a quote on our Long John Vibrating Post & Pile Driver.
- Only true vibrating drivers on the market
- Uses only vibrations and minimal down pressure
- Vibration does not transfer to your machine
- Easy to install and operate
- Drive posts in seconds not minutes
- Faster post-to-post set-up for reduced labor cost
Long John details
Specs & Stats
Produces up to
5000
Vibrations Per Minute
Center
Mounted System
Built-In
Hydraulic Ram
External Wired
Remote
Durable & Strong Weighing Approx.
1500 Lbs
Install Posts Up To
18+ Feet
In Length
Install Posts Up To
7+ Inches
In Diameter
10-26 GPM
Flow Rate
