

You’ve got tall posts to install, and that means you need equipment that is just as sturdy and durable. Our Long-John Post & Pile Driver is one of the most popular units that our customers have had in their arsenal for years to safely and efficiently install tall posts and piles of all kinds. Like all our equipment, this unit uses true vibration technology with an output of up to 5,000 vibrations per minute to help get the largest job done.
The Long John is also Vibe Drive Techonologies’ biggest Vibrating Post & Pile Driver designed to attach to mid-sized and large skid steers. This unit weighs 1,500 lbs and requires a mid-sized to larger skid steer model to handle it safely.
This vibrating post & pile driver unit has a built-in hydraulic ram that will allow you to slide the vibrating head to your desired height. This means you can install posts and piles up to 18+ feet in length.
You can control everything from the inside of your cab, or if you are working with your team, they can control the Long John ram up and down motion with the external wired remote.
The Long-John is used by clients almost entirely driving steel. Considering the cost of most Pile Drivers, the Long-John is extremely cost competitive.
Make even the largest job easier and safer by contacting Vibe Drive Technologies to receive a quote on our Long John Vibrating Post & Pile Driver.
- Only true vibrating drivers on the market
- Uses only vibrations and minimal down pressure
- Vibration does not transfer to your machine
- Easy to install and operate
- Drive posts in seconds not minutes
- Faster post-to-post set-up for reduced labor cost
Long John details
Specs & Stats

Produces up to
5000
Vibrations Per Minute

Center
Mounted System

Built-In
Hydraulic Ram

External Wired
Remote

Durable & Strong Weighing Approx.
1500 Lbs

Install Posts Up To
18+ Feet
In Length

Install Posts Up To
7+ Inches
In Diameter

10-26 GPM
Flow Rate